For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – In the face of the impending devastating threat from monster Hurricane Ian approaching the Florida peninsula including the Space Coast NASA technicians successfully moved the Artemis 1 Moon rocket back to inside the Vehicle Assembly Building (VAB) protective hangar Tuesday morning, Sept. 27, after starting the 4-mile trip from atop launch
For SpaceUpClose.com & RocketSTEM PLAYALINDA BEACH/KENNEDY SPACE CENTER, FL – Due to the impending threat from monster Hurricane Ian approaching the Florida peninsula including the Space Coast NASA officials have decided to roll the Artemis I Space Launch System (SLS) rocket and Orion spacecraft back to the Vehicle Assembly Building (VAB) protective shelter on late Monday evening, Sept. 26. “NASA
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – NASA successfully completed the critical cryogenic tanking test for the Artemis 1 Moon rocket on Wednesday, Sept. 21, after teams encountered another significant hydrogen leak near the start of the loading process engineers and then effectively resolved them in a timely manner at Launch Complex 39B at the Kennedy Space Center
KENNEDY SPACE CENTER, FL – NASA announced that technicians are repairing the leaking hydrogen fuel line on the mammoth Artemis 1 Moon rocket out at launch pad 39B which in turn will enable the team to carry out a full tanking demonstration test of super cold cryogenics to verify whether the dangerous leak has been fixed out at the pad
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – NASA announced the agency has moved up the rollout of the Artemis 1 Moon rocket from the iconic Vehicle Assembly Building (VAB) to its launch pad by nearly 2 days to Tuesday, Aug. 16 and is still targeting Aug. 29 as the launch date for the maiden flight of the mammoth
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – Enjoy our gallery of up close photos of NASA’s first ever Space Launch System (SLS) Mega Moon rocket taken at Launch Complex 39B a few days ago at NASA’s Kennedy Space Center (KSC) before it rolls back to the Vehicle Assembly Building (VAB) for repairs to the rocket and ground systems
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER/CANAVERAL NATIONAL SEASHORE, FL – NASA has started the critical countdown and fueling test known as the Wet Dress Rehearsal (WDR) on April 1 as planned for the first ever Space Launch System (SLS) Mega Moon rocket rolled out to its launchpad atop the Mobile Launcher at the Kennedy Space Center (KSC) in Florida
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – NASA’s first ever Space Launch System (SLS) Mega Moon rocket topped by the Orion deep space human capsule stands proudly tall at its launchpad at the Kennedy Space Center (KSC) as of Friday morning, March 18, following its absolutely stunning ten and a half hour roll out from the iconic Vehicle
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – NASA’s maiden Space Launch System (SLS) Mega Moon rocket has rolled out in stunning fashion from the iconic Vehicle Assembly Building (VAB) on a spectacular 4 mile trip to the launchpad at the Kennedy Space Center (KSC) – with its lunar objective for the Orion deep space crew capsule movingly visible
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – The first ever built and truly mammoth 212 foot tall core stage for NASA’s Space Launch System (SLS) mega rocket was at last raised vertical inside the iconic Vehicle Assembly Building (VAB) this past weekend and then raised high and stacked in between the two twin 177 foot tall solid rocket